Contractor Management: What Should You Check Before Work Starts?
Guidance dated 11 September 2026
Before a contractor starts, establish what work will be done, whether the contractor is suitable and how the risks will be managed. Exchange the information each party needs and agree who controls the interfaces with your staff, premises and other contractors.
Both the business engaging the contractor and the contractor have health and safety responsibilities. Buying in a service does not remove the need to manage what happens on your site. [50]
Define the job and its boundaries
Write a clear scope, including the location, access, working hours and what completion means. Identify activities outside the contractor’s scope that could still affect the work, such as deliveries, cleaning or another trade operating nearby.
Check whether the task is construction work within CDM. Refurbishment, repairs and some maintenance activities may trigger client duties even when the job is short. Where CDM applies, make the required arrangements before work starts. [33]
A vague instruction to repair a problem can conceal important decisions about isolation, access equipment, intrusive work or temporary protection.
Check competence for the actual task
Ask for evidence proportionate to the risk. Relevant experience, competent people, appropriate equipment and the capacity to supervise the job all matter. A certificate of general membership or an insurance schedule is not a complete competence assessment.
For specialist activities, verify relevant authorisations, licences or qualifications where required. Check that they relate to the organisation or person carrying out the work and remain applicable to the proposed scope.
Ask how subcontractors will be selected and supervised. The contractor you appoint may not be the organisation that sends everyone to site. HSE’s contractor guidance highlights selection, coordination, competence and supervision as connected issues. [51]
Give the contractor useful site information
Share relevant hazards and restrictions in time for planning. Depending on the work, this may include service information, asbestos information, traffic routes, fire arrangements, occupied areas and access limitations.
Explain which information is reliable and where investigation is still needed. An old plan should not be treated as proof of a service location without the checks appropriate to the task.
Information must travel both ways. Find out what hazards the contractor will introduce and how those may affect employees, visitors or neighbouring activities. [52]
Review RAMS as a working proposal
Check that the documents match the job, site and equipment. The method should explain the sequence, significant controls, supervision and emergency arrangements. Resolve contradictions and missing information before accepting the plan.
If a document says work will be completed from a platform, confirm the access and floor conditions allow that equipment to be used. If it depends on an isolation, agree who arranges and verifies it.
A permit, where appropriate, is part of the control arrangements. It is not a substitute for assessment, competence or a safe method. The authorising person needs enough information and authority to decide whether the work can proceed.
Agree the start and supervision arrangements
Provide a site-specific induction covering relevant hazards, rules, emergency procedures and the people to contact. Confirm the agreed work area, welfare arrangements and any restrictions.
Name the contractor’s supervisor and your own point of contact. Decide how the work will be checked, what must be reported and who can stop the activity. The intensity of monitoring should reflect the risk and the circumstances.
For an illustrative maintenance visit in an occupied workshop, the contractor may need a defined work zone and coordination with production. Signing in at reception does not establish either arrangement.
Plan changes and handback
Unexpected conditions should trigger communication and review. If the contractor finds an unknown material, cannot achieve the planned isolation or needs different equipment, the affected work should pause until a suitable approach is agreed.
At handback, confirm the area is safe, relevant testing and documentation are complete, and temporary restrictions or isolations are managed through the agreed process. Check any defects or limitations that the occupier needs to know about.
Review the contractor’s performance afterwards. Use what you learn to improve future selection and planning, rather than relying solely on whether the job finished on time.
FAQs
Is an insurance certificate enough to approve a contractor
No. It may be part of procurement checks, but it does not demonstrate competence or show how the job will be carried out safely.
Must we supervise every action
The contractor remains responsible for managing its work. You need coordination and monitoring proportionate to your role and the risks, rather than either taking over the trade or leaving it entirely unchecked.
Can regular contractors skip induction
They still need current, relevant site information. A proportionate refresher may be appropriate, but familiarity is not a reason to ignore changed hazards or arrangements.
How Secure Safety Solutions can help
We can help review contractor selection, RAMS checks, site arrangements and monitoring. Where your internal team manages a busy programme of work, we can provide additional health and safety support around the decisions that matter.
Improve your contractor arrangements
Sources and further reading
- [33] HSE: Planning for construction work
- [50] HSE: Using contractors
- [51] HSE: Human factors and contractors
- [52] HSE: Contractors and subcontractors
General guidance. The arrangements you need depend on your activities, premises and location.